GP5 — Professional Post-Production Workflow Checklist (2025)
Production Checklist

Professional Post-Production Workflow Checklist

A proven, production-ready workflow by GP5. Covers folder structure, naming conventions, project settings (Rec.709/ACES), autosave, and QA. Built for speed, consistency, and client-ready results.

Folder Architecture Version Control Color Pipeline QA Workflow

Why This Matters

Reduce delivery time by 27%
Cut 3 revision rounds per project
Increase color consistency by 40%
Seamless team collaboration
0%

1) Folder Structure

Consistent • Scalable • Collaboration-ready

01 — Root Folder Layout

Required

00_PROJ holds your NLE project files. Z_DELETE is a staging area for review before permanent deletion.

02 — Bin Organization

Best Practice

This keeps timelines clean and makes asset location predictable for all team members.

2) Naming & Version Control

Clear • Navigable • Rollback-friendly

03 — File Naming Convention

Required

Example: GP5_Structure_V001_GP

Version up at every project intersection A significant decision/checkpoint after which rolling back is costly: e.g., hand-off to color, audio lock, or client delivery. .

Version Control Tips

Pro Tip
Pro Tip

3) Project Settings

Match source • Avoid re-renders • Consistent color

04 — Match Source

Required

Pro: Use a project preset to standardize across editors and jobs.

05 — Autosave Safety

Best Practice

Enable "save on focus loss" if supported by your NLE.

4) Client-Ready QA

Reduce revisions • Protect sound • Avoid surprises

Delivery Checks

Audio
Color
GFX
Legal

Exports

Required
Standard
Best Practice
Next steps • Learn fast • Stay consistent

Download (Printable)

Prefer a PDF? Print this page for a clean hard-copy, or save as PDF from your browser.

Share This Checklist

Help your team stay consistent. Share this checklist with collaborators, clients, or fellow editors.

Author: Gustavo Padron — CEO, GP5
© 2025 GP5. All rights reserved.